Production - Planning & Manufacturing

 
     
 

We maintain an ERP system for highly reliable production planning. Based on purchase orders, relevant material shall be selected for sequential production cycle. A committed delivery schedule will be conveyed to the customer.

  • Slitting: A state-of-the-art twin loop line ensures stress-free and accurate slitting. The standard slit tolerances are +/- 0.05 mm to +/- 0.075 mm. Total 16 slits can be accommodated at a time. One more dedicated line is planned which can accommodate coil width upto 1300 mm and weights upto 20 M.T. The material to be slitted will have a thickness range from 0.18 mm upto 1.0 mm and shall be dedicated both for CRGO and CRNGO. All slitters are of carbide and spacers of alloy steel. A very high level of slit accuracies can be achieved with1 burr-free slitting and classic built-ups of slitted coils.
     

  • Manufacturing of EI Laminations: These laminations are manufactured as per Imperial & DIN standards. High speed presses from 32T upto 360T have speed upto 700 SPM are used for punching. For Ballast application EI/UT laminations are offered with various air - gap cutting as per customer specification. Any non standard designs can also be manufactured to suit customer requirements.

    We outsource Bobbins, Clamps and Brackets for standard and non standard laminations.
     

  • Manufacturing of transformer Laminations: A wide range of applications entail varied manufacturing processes. For rectangular strip laminations we have CNC cut-to-Length (CTL) lines capable for accommodating lengths upto 2500 mm and widths upto 200 mm with multiple hole options. Both shearing and hole piercing is aided by carbide tool. This ensures highest possible stacking factor.

 
 

For distribution and power transformers, three CNC CTLs are planned out of which one will be functional soon and shall cater to transformer ratings up to 150 MVA. Balance two lines shall be installed later. We have incorporated auto stackers for the ease of handling cores and to avoid stress on the finished laminations on account of manual handling. Both conventional and step-lap configurations shall be possible in our facility, Carbide tools for mitred/notch will establish exceptional stacking factor.

We shall be flexible to explore the value added services to completely assemble the stacks as per customer requirements.

 
     
 
  • Annealing: A continuous conveyorised CNC furnace shall have unparalleled capability to stress relieve EI/Strip laminations from both CRNGO and CRGO materials. In certain cases CRGO may be replaced by high grade of annealed CRNGO thereby making a transformer more cost effective. If bluing is required to inhibit corrosion, the same can be offered simultaneously.

 
     
     
 

Division – History and Applications

 
 

Raw Material – Inventory & Inspection

 
 

Tool Room - Design and Manufacturing

 
 

Quality Assurance

 
 

Packing & Dispatch

 
 

 

 
   
 